{"id":1838,"date":"2011-04-01T09:33:10","date_gmt":"2011-04-01T08:33:10","guid":{"rendered":"http:\/\/www.propertysurveying.co.uk\/newsletter\/?page_id=1838"},"modified":"2017-08-14T09:27:48","modified_gmt":"2017-08-14T08:27:48","slug":"high-speed-rail-link-consultation-period","status":"publish","type":"page","link":"https:\/\/www.propertysurveying.co.uk\/newsletter\/?page_id=1838","title":{"rendered":"High Speed Rail Link Consultation Period"},"content":{"rendered":"<p>A public consultation about the proposed high speed rail link from Birmingham to London has begun. It will continue until July 29th 2011. The government has a travelling roadshow which is being taken along the 140 mile proposed route, visiting the places which will be affected by the new rail service, as well as certain other major UK cities.<\/p>\n<p>If the plan is approved, work will begin in 2015, and will cost an estimated \u00c2\u00a317bn. Philip Hammond, the Transport Secretary, said the high-speed line (HS2) would mean a boost for the UK economy of \u00c2\u00a344bn, and create 8,000 jobs in its construction. Phase One is due to be completed by 2026.<\/p>\n<p>There are plans to extend the link to Manchester and Leeds (Phase Two) at a cost of \u00c2\u00a332bn. The completion for this phase is expected to be 2032\/33.<\/p>\n<p>The new service will make the journey time between London and Birmingham less than 50 minutes. There are expected to be at least 14 trains running every hour, each with as many as 1,100 seats.<\/p>\n<p>Philip Hammond, speaking at a conference in Birmingham, said that other countries were already expanding their rail networks to include high speed trains, and added \u00e2\u20ac\u0153We cannot afford to be left behind &#8211; investing in high-speed rail now is vital to the prosperity of future generations.&#8221;<\/p>\n<p>Opponents say that no alternatives to this route are being offered, and it is a very expensive project at a time when money is in short supply. It will also adversely affect a large area of rural countryside.<\/p>\n<p>Proponents say that the existing rail network is insufficient for future needs, and we must invest now for future users.<\/p>\n<p>Residents of the locations along the route are getting the chance to hear what the trains will sound like, using a simulation based on recordings of existing trains and high-speed trains running in France. Having listened to it himself at the Roadshow at the Thames, Mr Hammond said \u00e2\u20ac\u0153Unless you are listening for it, you can hardly hear the noise of the train against the background noises.\u00e2\u20ac\u009d\u00c2\u00a0 As one cynic commented \u00e2\u20ac\u0153he would say that, wouldn\u00e2\u20ac\u2122t he?\u00e2\u20ac\u009d<\/p>\n<p>Should the proposal be approved by the Government and be given their full support, with full Compulsory Purchase and Compensation Legislation ratified, there will undoubtedly be professional work for Solicitors and Valuers along its path in addition to the many contractors and sub-contractors who will carry out the actual physical work of construction.<\/p>\n<p>31st March 2011<\/p>\n","protected":false},"excerpt":{"rendered":"<p>A public consultation about the proposed high speed rail link from Birmingham to London has begun. It will continue until July 29th 2011. The government has a travelling roadshow which is being taken along the 140 mile proposed route, visiting the places which will be affected by the new rail service, as well as certain &hellip; <a href=\"https:\/\/www.propertysurveying.co.uk\/newsletter\/?page_id=1838\" class=\"more-link\">Continue reading<span class=\"screen-reader-text\"> &#8220;High Speed Rail Link Consultation Period&#8221;<\/span><\/a><\/p>\n","protected":false},"author":2,"featured_media":0,"parent":0,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"footnotes":""},"folder":[],"class_list":["post-1838","page","type-page","status-publish","hentry"],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v27.5 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>High Speed Rail Link Consultation Period - Property Surveying NEWSLETTER<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.propertysurveying.co.uk\/newsletter\/?page_id=1838\" \/>\n<meta property=\"og:locale\" content=\"en_GB\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"High Speed Rail Link Consultation Period - Property Surveying NEWSLETTER\" \/>\n<meta property=\"og:description\" content=\"A public consultation about the proposed high speed rail link from Birmingham to London has begun. It will continue until July 29th 2011. The government has a travelling roadshow which is being taken along the 140 mile proposed route, visiting the places which will be affected by the new rail service, as well as certain &hellip; Continue reading &quot;High Speed Rail Link Consultation Period&quot;\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.propertysurveying.co.uk\/newsletter\/?page_id=1838\" \/>\n<meta property=\"og:site_name\" content=\"Property Surveying NEWSLETTER\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/PropertySurveying\" \/>\n<meta property=\"article:modified_time\" content=\"2017-08-14T08:27:48+00:00\" \/>\n<meta name=\"twitter:label1\" content=\"Estimated reading time\" \/>\n\t<meta name=\"twitter:data1\" content=\"2 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.propertysurveying.co.uk\\\/newsletter\\\/?page_id=1838\",\"url\":\"https:\\\/\\\/www.propertysurveying.co.uk\\\/newsletter\\\/?page_id=1838\",\"name\":\"High Speed Rail Link Consultation Period - Property Surveying NEWSLETTER\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.propertysurveying.co.uk\\\/newsletter\\\/#website\"},\"datePublished\":\"2011-04-01T08:33:10+00:00\",\"dateModified\":\"2017-08-14T08:27:48+00:00\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.propertysurveying.co.uk\\\/newsletter\\\/?page_id=1838#breadcrumb\"},\"inLanguage\":\"en-GB\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/www.propertysurveying.co.uk\\\/newsletter\\\/?page_id=1838\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.propertysurveying.co.uk\\\/newsletter\\\/?page_id=1838#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.propertysurveying.co.uk\\\/newsletter\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"High Speed Rail Link Consultation Period\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.propertysurveying.co.uk\\\/newsletter\\\/#website\",\"url\":\"https:\\\/\\\/www.propertysurveying.co.uk\\\/newsletter\\\/\",\"name\":\"Property Surveying NEWSLETTER\",\"description\":\"The NEWSLETTER\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.propertysurveying.co.uk\\\/newsletter\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/www.propertysurveying.co.uk\\\/newsletter\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-GB\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.propertysurveying.co.uk\\\/newsletter\\\/#organization\",\"name\":\"Property Surveying NEWSLETTER\",\"url\":\"https:\\\/\\\/www.propertysurveying.co.uk\\\/newsletter\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-GB\",\"@id\":\"https:\\\/\\\/www.propertysurveying.co.uk\\\/newsletter\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/www.propertysurveying.co.uk\\\/newsletter\\\/wp-content\\\/uploads\\\/cropped-property-surveying-logo-for-newsletter-body-1.png\",\"contentUrl\":\"https:\\\/\\\/www.propertysurveying.co.uk\\\/newsletter\\\/wp-content\\\/uploads\\\/cropped-property-surveying-logo-for-newsletter-body-1.png\",\"width\":240,\"height\":50,\"caption\":\"Property Surveying NEWSLETTER\"},\"image\":{\"@id\":\"https:\\\/\\\/www.propertysurveying.co.uk\\\/newsletter\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"sameAs\":[\"https:\\\/\\\/www.facebook.com\\\/PropertySurveying\"]}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"High Speed Rail Link Consultation Period - Property Surveying NEWSLETTER","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.propertysurveying.co.uk\/newsletter\/?page_id=1838","og_locale":"en_GB","og_type":"article","og_title":"High Speed Rail Link Consultation Period - Property Surveying NEWSLETTER","og_description":"A public consultation about the proposed high speed rail link from Birmingham to London has begun. It will continue until July 29th 2011. The government has a travelling roadshow which is being taken along the 140 mile proposed route, visiting the places which will be affected by the new rail service, as well as certain &hellip; Continue reading \"High Speed Rail Link Consultation Period\"","og_url":"https:\/\/www.propertysurveying.co.uk\/newsletter\/?page_id=1838","og_site_name":"Property Surveying NEWSLETTER","article_publisher":"https:\/\/www.facebook.com\/PropertySurveying","article_modified_time":"2017-08-14T08:27:48+00:00","twitter_misc":{"Estimated reading time":"2 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/www.propertysurveying.co.uk\/newsletter\/?page_id=1838","url":"https:\/\/www.propertysurveying.co.uk\/newsletter\/?page_id=1838","name":"High Speed Rail Link Consultation Period - Property Surveying NEWSLETTER","isPartOf":{"@id":"https:\/\/www.propertysurveying.co.uk\/newsletter\/#website"},"datePublished":"2011-04-01T08:33:10+00:00","dateModified":"2017-08-14T08:27:48+00:00","breadcrumb":{"@id":"https:\/\/www.propertysurveying.co.uk\/newsletter\/?page_id=1838#breadcrumb"},"inLanguage":"en-GB","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.propertysurveying.co.uk\/newsletter\/?page_id=1838"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/www.propertysurveying.co.uk\/newsletter\/?page_id=1838#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.propertysurveying.co.uk\/newsletter\/"},{"@type":"ListItem","position":2,"name":"High Speed Rail Link Consultation Period"}]},{"@type":"WebSite","@id":"https:\/\/www.propertysurveying.co.uk\/newsletter\/#website","url":"https:\/\/www.propertysurveying.co.uk\/newsletter\/","name":"Property Surveying NEWSLETTER","description":"The NEWSLETTER","publisher":{"@id":"https:\/\/www.propertysurveying.co.uk\/newsletter\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.propertysurveying.co.uk\/newsletter\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-GB"},{"@type":"Organization","@id":"https:\/\/www.propertysurveying.co.uk\/newsletter\/#organization","name":"Property Surveying NEWSLETTER","url":"https:\/\/www.propertysurveying.co.uk\/newsletter\/","logo":{"@type":"ImageObject","inLanguage":"en-GB","@id":"https:\/\/www.propertysurveying.co.uk\/newsletter\/#\/schema\/logo\/image\/","url":"https:\/\/www.propertysurveying.co.uk\/newsletter\/wp-content\/uploads\/cropped-property-surveying-logo-for-newsletter-body-1.png","contentUrl":"https:\/\/www.propertysurveying.co.uk\/newsletter\/wp-content\/uploads\/cropped-property-surveying-logo-for-newsletter-body-1.png","width":240,"height":50,"caption":"Property Surveying NEWSLETTER"},"image":{"@id":"https:\/\/www.propertysurveying.co.uk\/newsletter\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/PropertySurveying"]}]}},"_links":{"self":[{"href":"https:\/\/www.propertysurveying.co.uk\/newsletter\/index.php?rest_route=\/wp\/v2\/pages\/1838","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.propertysurveying.co.uk\/newsletter\/index.php?rest_route=\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/www.propertysurveying.co.uk\/newsletter\/index.php?rest_route=\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/www.propertysurveying.co.uk\/newsletter\/index.php?rest_route=\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/www.propertysurveying.co.uk\/newsletter\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=1838"}],"version-history":[{"count":0,"href":"https:\/\/www.propertysurveying.co.uk\/newsletter\/index.php?rest_route=\/wp\/v2\/pages\/1838\/revisions"}],"wp:attachment":[{"href":"https:\/\/www.propertysurveying.co.uk\/newsletter\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=1838"}],"wp:term":[{"taxonomy":"folder","embeddable":true,"href":"https:\/\/www.propertysurveying.co.uk\/newsletter\/index.php?rest_route=%2Fwp%2Fv2%2Ffolder&post=1838"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}